Mobile Phone
+86 186 6311 6089
Call Us
+86 631 5651216
E-mail
gibson@sunfull.com

Factory Cheap Hot Electrical Harness Tape - Customized Harness Wire Auto Electrical Wiring Harness Cable Assembly for Home Appliance – Sunfull Hanbecthistem

Short Description:


Product Detail

Company Advantage

Advantage Compared with the Industry

Product Tags

Related Video

Feedback (2)

abide by the contract", conforms on the market requirement, joins from the market competition by its good quality likewise as provides more comprehensive and superb support for customers to let them become large winner. The pursue of the company, is definitely the clients' pleasure for Thermal Switch Protector, Bimetal Thermostat Temperature Control, Thermistor Type Temperature Sensor, We welcome shoppers, enterprise associations and buddies from all areas of your environment to speak to us and request cooperation for mutual gains.
Factory Cheap Hot Electrical Harness Tape - Customized Harness Wire Auto Electrical Wiring Harness Cable Assembly for Home Appliance – Sunfull Hanbecthistem Detail:

Description

Product Name Customized Harness Wire Auto Electrical Wiring
Harness Cable Assembly for Home Appliance
Use Wire harness for refrigerator, freezer, ice machine
After Humid Heat Test Insulation Resistance ≥30MΩ
Terminal Molex 35745-0210, 35746-0210, 35747-0210
Housing Molex 35150-0610, 35180-0600
Adhesive tape Lead-free tape
Foams 60*T0.8*L170
Test 100% test before delivery
Sample Sample available
Terminal/Housing Type Customized
Wire Customized

Applications

Typical Applications:

- Refrigerator
- Freezer
- Ice Machine
- Electrical Stove
- Washing Machine

p-d-1

Why Are Wire Harnesses Assembled Manually?

Wire harness assembly process is one of the few remaining manufacturing processes that is more efficiently done by hand, rather than automation. This is due to the variety of processes that are involved in the assembly. These manual processes include:

Installing terminated wires in various lengths

Routing wires and cables through sleeves and conduits

Taping breakouts

Conducting multiple crimps

Binding the components with tape, clamps or cable ties

Because of the difficulty involved in automating these processes, manual production continues to be more cost-effective, especially with small batch sizes. This is also why harness production takes longer than other types of cable assemblies. Production can take anywhere from a few days to several weeks. The more complicated the design, the longer production time is required.

 

However, there are certain portions of pre-production that can benefit from automation. These include:

Using an automated machine to cut and strip the ends of individual wires

Crimping terminals on one or both sides of the wire

Plugging wires pre-fitted with terminals into connector housings

Soldering wire ends

Twisting wires


Product detail pictures:

Factory Cheap Hot Electrical Harness Tape - Customized Harness Wire Auto Electrical Wiring Harness Cable Assembly for Home Appliance – Sunfull Hanbecthistem detail pictures

Factory Cheap Hot Electrical Harness Tape - Customized Harness Wire Auto Electrical Wiring Harness Cable Assembly for Home Appliance – Sunfull Hanbecthistem detail pictures

Factory Cheap Hot Electrical Harness Tape - Customized Harness Wire Auto Electrical Wiring Harness Cable Assembly for Home Appliance – Sunfull Hanbecthistem detail pictures


Related Product Guide:

We depend on sturdy technical force and continually create sophisticated technologies to meet the demand of Factory Cheap Hot Electrical Harness Tape - Customized Harness Wire Auto Electrical Wiring Harness Cable Assembly for Home Appliance – Sunfull Hanbecthistem , The product will supply to all over the world, such as: Rwanda, Thailand, Malaysia, Our objective is "to supply first step products and best service for our customers, thus we are sure you must have a margin benefit through cooperating with us". If you are interested in any of our products or would like to discuss a custom order, please feel free to contact us. We are looking forward to forming successful business relationships with new clients around the world in the near future.

办公楼1Our product has passed the CQC,UL,TUV certification and so on, has applied for patents accumulatively more than 32 projects and has obtained scientific research departments above the provincial and ministerial level more than 10 projects. Our company has also passed the ISO9001 and ISO14001 system certificated, and national intellectual property system certificated.

Our research and development and production capacity of the company’s mechanical and electronic temperature controllers have ranked in the forefront of the same industry in the country.7-1

  • As a veteran of this industry, we can say that the company can be a leader in the industry, select them is right.
    5 Stars By Claire from Mombasa - 2018.09.21 11:44
    Perfect services, quality products and competitive prices, we have work many times, every time is delighted, wish continue to maintain!
    5 Stars By Maggie from Salt Lake City - 2018.11.11 19:52
    Write your message here and send it to us